They finished the new runway a couple weeks ahead of schedule. It's flat end to end. You can almost read the numbers from the other end.
Looking SW down Rwy 5 you can see the grass where the taxiway was. Because it sets so much lower than the runway all taxiing may have to be on the runway. That will really limit how many planes can be in the pattern at one time to about 2 or 3. We'll find out in the spring when we can drive on it.Cylinder 1 Exhaust. The oil stain is from oil I sprayed in the cylinders to help prevent rust while it sat.
Cylinder 3 Exhaust
Caleb Glick convinced me to clean the valve stem and guide without removing the cylinder. My first step was to remove the rocker and valve springs. To hold the valve closed while I compressed the spring, I bought a 50 ft. roll of 1/4" nylon rope. I fed 25 feet into the cylinder with the piston down, then rotated the piston to top center, compressing the rope against the valve. It took that much rope to get the rope tight, without the piston going past top center. With the springs removed I clamped a drill chuck on the end of the valve stem. I was able to pull the valve tight and compression checked good. It looks like we're on the right track.
I tied a length of flat rib stitch cord to the groove in the stem where the little keepers for the spring retainer sit.
There is some soot build up on the lower end so I cleaned it up and polished it with crocus cloth.
The valve stem and guide were oiled and the cord was then used to pull the valve stem back through the guide. I used a curved end rib stitch needle to lift the valve end to get it aligned with the guide.













